/ Field library · 204 documents · 136 tools · No email required
Every checklist, glossary and reference — in the order the job runs.
The code is numbered by chapter. A project is not. This library is ordered the way a design-and-construction job actually moves: feasibility, basis, design by system, permit documents, review, construction, testing, inspection, recertification. Each phase lists the downloads that belong to it and links the field tools that answer it. English and Spanish where both exist.
Nothing matched. Try a code section (607), a system (grease), or a phase word (inspection).
01Feasibility & due diligence
Before anyone draws anything: can the site take the work, what the jurisdiction requires, and what it costs to find out.
Run the field tools for this phase → 16 documents
02Basis of design & definitions
Fix the basis before the first calculation — code edition, occupancy, the defined terms, and what the equipment has to be listed for.
Run the field tools for this phase → 4 documents
03Design — ventilation & outdoor air
How much outdoor air the space needs, where it enters, and whether the path you drew counts.
Run the field tools for this phase → 12 documents
04Design — exhaust, kitchen & hazardous
Whether exhaust is required at all, what hood the process needs, where it may discharge, and where an ordinary rate stops applying.
Run the field tools for this phase → 43 documents
05Design — ducts, plenums & dampers
What the duct is made of, where it may run, and which damper belongs in which rated assembly.
Run the field tools for this phase → 28 documents
06Design — combustion air, chimneys & vents
Whether the appliance room can breathe, which document governs the vent, and whether an existing chimney can be inherited.
Run the field tools for this phase → 37 documents
07Design — appliances, equipment & installation
Clearance, access, support and condensate — the installation details that get caught at rough-in instead of at design.
Run the field tools for this phase → 25 documents
08Permit documents & submittal
What has to be on the sheets, what the county wants uploaded, and what stops the clock before review starts.
Run the field tools for this phase → 17 documents
09Plan review & comment response
What the comment is really asking for, which clock is running, and what closes it without a second cycle.
Run the field tools for this phase → Private provider plan review (MEP) → 8 documents
10Construction & field coordination
Temporary service, change-outs, bonding and grounding — the decisions made after the permit and before closeout.
Run the field tools for this phase → 4 documents
11Testing, balancing & commissioning
Proving the installed system does what the drawings said, with a record that survives inspection.
Run the field tools for this phase → 4 documents
12Inspections & closeout
What each inspector opens first, and what the certificate actually turns on.
Run the field tools for this phase → Private provider inspections (MEP) → 4 documents
13Occupancy & recertification
The obligations that arrive years after closeout, and the records that decide them.
Run the field tools for this phase → 2 documents
Need this applied to a live project?
These references teach the decision. A live project needs the adopted code, the site facts and a licensed engineer to own the result. That is a scoped MasterBuild engagement.
Educational references built on the model IMC 2024 and the firm's published field method. Miami-Dade reviews the Florida Building Code, Mechanical, 8th Edition (2023) — based on IMC 2021 — plus local amendments. Verify the adopted edition before project use.