/ Field knowledge · IMC 506.3.11

Spot wrap is not an enclosure.

If a Type I grease duct punches a ceiling, wall, floor, or any concealed space, IMC 506.3.11 wants it enclosed from that penetration to the outlet. The enclosure serves a single grease duct — no other trades inside. Rating: not less than the penetrated assembly and not less than 1 hour. No fire or smoke dampers in grease ducts. A wrap that only covers the tight spots is not an enclosure.

Educational 2024 International Mechanical Code (IMC) 506.3.10–506.3.12 from Daily Code Talk. Confirm the adopted edition. Distinct from 506.3 construction and 607.5.5 prohibited dampers. This is not an enclosure design. Exception: no enclosure if it only penetrates a non-rated roof/ceiling assembly.

Wrap only at the tight joists

Or a fire damper “to be safe” in the grease shaft. Or a cleanout behind gypsum with no rated access panel. Enclosure, prohibited damper, and rated access are three separate first-cycle comments.

Source: Daily Code Talk — IMC 506.3.10–506.3.12 · construction: 506.3 · slope: 506.3.7 · shafts: 607.5.5.

What to send

Where the grease duct punches a ceiling or shaft, whether wrap or a shaft is proposed, and whether cleanouts in that enclosure have rated access panels.

If wrap only covers the tight spots

Send the route. Masterbuild will say whether 506.3.11 still has no continuous enclosure to the outlet — or 506.3.12 still has a cleanout with no rated door.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is project-specific engineering advice, a code interpretation for your project, or a representation about permit approval. Confirm the adopted edition. 1-hour enclosure, 18 in / 6 in shaft clearances, ASTM E2336 continuous wrap, UL 2221, 4 in underground concrete, and rated access panels are 2024 IMC 506.3 education from Daily Code Talk — not an enclosure design. This page is not legal advice.