/ PE-Led MEP · Miami
MEP Engineering in Miami
MasterBuild Consulting is a PE-led MEP engineering firm in Miami, Florida. HVAC, plumbing, fire protection, and electrical design for commercial, high-end residential, and mission-critical projects. The licensed PE reviews, coordinates, and technically directs every set - no project manager between you and the engineer. The sealing professional for each discipline is named in the written scope.
Florida-licensed, Miami-based. TX, NJ, NY, and PA work is reviewed by request based on scope, licensure requirements, teaming needs, and jurisdiction expectations. Bilingual EN / ES. Fixed-fee proposals issued in writing after a scope review - no hourly billing for standard permit work.
Service pages: MEP engineering in Miami · private provider plan review and inspections (MEP) · Electrical Building Recertification readiness · Miami-Dade septic feasibility screening · private-well record and permit readiness · commercial kitchen ventilation · existing-building MEP · about the PE · how an engagement works · send project background.
Engagement sizes
Tenant Improvement / Renovation: $12k - $45k+; New Construction & Mission-Critical: $25k - $120k+; PE Review & Responsible-Charge Sealing: $1.5k - $7k; Feasibility / Capacity Study: $3k - $18k; Monthly Design Advisory: $1.5k - $6.5k / mo; construction support: quoted by project. Final fees follow a written scope review.
Services
- HVAC system design, load analysis, and ventilation coordination
- Plumbing design including domestic water, waste, vent, and gas
- Fire protection coordination and suppression review
- Electrical design for service, distribution, lighting, critical, and life-safety systems
- Existing commercial-building feasibility report support, including plumbing-system assessments
- Permit-set MEP packages and AHJ comment response
- Mission-critical scopes - healthcare (ASHRAE 170 / NFPA 99), labs, data centers
- Construction-phase advisory, RFIs, and field coordination
- Private provider plan review and inspections for mechanical, plumbing, and electrical under F.S. 553.791 (Miami-Dade firm PF-2026000081), on buildings MasterBuild did not design
- Monthly Design Advisory retainer for owners, architects, and contractors
Free field tools
136 free decision screens, no login and no email. They classify the path, name the document that actually governs the question, and produce a plain-text record you can paste into an RFI. Grouped the way a job runs: project basis and evidence readiness, ventilation and outdoor air, kitchen, grease and hoods, general and process exhaust, combustion air, chimneys, vents and connectors, ducts, plenums and dampers, hazardous and special-process exhaust, smoke control and rated assemblies, equipment, access and installation, plumbing, electrical and recertification, and permits, comments and AHJ. Open the field tools → · Herramientas de campo (español) →
None of them sizes equipment, performs a venting calculation, sets a recertification due date, or replaces the adopted Florida Building Code, the product listing, the manufacturer instructions or the Professional Engineer of record. Miami-Dade reviews the Florida Building Code, Mechanical, 8th Edition (2023) — based on IMC 2021 — not the 2024 model the tools teach.
Daily Code Talk
Drawing-based explanations of MEP code logic, permit sensitivity, and field coordination - written by MasterBuild's PE and searchable by IMC chapter and section. Open Daily Code Talk → Join the free Code Desk email list →
Resources
See the full catalog on the dedicated Field Guides & Working Tools page →. Start free, with no email required: the IMC 2024 Chapter 4 Ventilation Fundamentals Field Guide, the Chapter 8 four-gate existing-chimney acceptance sample, the Chapter 7 combustion-air sample, the eight Miami-Dade county checklists, and the Daily Code Talk archive. Paid working guides: IMC Chapter 1 Permit Process Field Guide — $57, IMC Chapter 2 Definitions & Redline Prevention Field Guide — $57, IMC 2024 Chapter 3 Installation Readiness & Field Coordination Guide — $57, Permit Readiness Review Pack — $79, Owner-Side MEP Review Checklist Bundle — $99, Ventilation & Special Exhaust Field Guide — $149, IMC 2024 Chapter 6 Duct Systems Field Guide — $149, Combustion Air Field Guide (IFGC 304) — $149, IMC 2024 Chapter 5 Exhaust Systems Field Guide — $199, IMC 2024 Chapters 6 + 7 Bundle — $249, IMC 2024 Chapter 8 Chimneys and Vents Field Guide — $199, and the Combustion Air + Venting Bundle, Chapters 7 and 8 — $299. Each chapter guide is a complete standalone package with a Read First file, the field guide, and its working tools. Chapter 5 is the deepest of the set: 31 pages across IMC Sections 501-513 plus a ten-sheet working file. Project-specific review begins with a written scope.
Contact
+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com
Miami, FL · Licensure confirmed per project scope and jurisdiction.
LinkedIn: linkedin.com/in/osmanyportal
Send Project Background →
JavaScript is required for the full interactive experience - including the bilingual EN/ES toggle, the resource library, and the contact form. The static text above is a courtesy fallback.