/ Herramientas · Educativo
Empezar: empezar aquí. Mapa: conocimiento de campo. Las 48 pantallas completas están en field tools (inglés).
Ayudas que convierten una pregunta vaga en una mejor consulta.
No dimensionan equipos, no fijan la fecha de recertificación y no sustituyen el Código de Construcción de Florida adoptado ni al PE de registro.
Related working PDFs: Resources · Miami-Dade permit resources · FBC vs IMC · What to send. English: Field tools.
01 · IMC 505–508
Kitchen Type I / Type II pathfinder
The hood type follows the contaminant, not the room name. Pick the cooking that actually happens.
Educational classification against the model IMC. More: kitchen exhaust hub.
02 · IMC Table 403.3.1.1 (2024 model)
Outdoor-air occupancy estimator
Breathing-zone outdoor air Vbz = Rp × Pz + Ra × Az. This is not system outdoor air and not a 170 calculation.
Healthcare / I-2: ASHRAE 170 / IMC 407. Garages: use the 404 tool below. Free guide: Chapter 4 PDF.
03 · IMC 404 · Daily Code Talk #38
Enclosed-garage ventilation estimator
Full-On ≥ 0.75 cfm/sf. Automatic CO/NO₂ systems also need Standby ≥ 0.05 cfm/sf. Open-garage definitions are a building-code question, not this math.
04 · IMC Chapter 7 educational rates
Combustion-air method check
Method first, free area second. Direct-vent appliances follow the listing. Nominal louver size is not free area.
05 · IMC 508
Kitchen makeup-air equality check
Replacement air has to be approximately equal to exhaust and actually available when the hood is on. Transfer air is not a slogan.
06 · IMC 607
Fire / smoke damper pathfinder
The assembly type controls the damper. A typical that says “F/S where required” is why the comment exists.
07 · Plan-review triage
Comment classifier
Pick the kind of comment. Get the hub, the usual drawing miss, and what to send. Not a code opinion on your letter.
Library of typical wording: typical plan-review comments.
08 · Miami-Dade electrical recertification
Records pack — not a due-date calculator
Masterbuild does not invent your deadline. The notice does. This checklist builds the package any responsible electrical professional will ask for. Not the same process as Florida’s statewide structural milestone inspection — see electrical vs structural recertification.
Copy this into the intake message
09 · IMC 401 vs 403 educational
Natural vs mechanical outdoor air
Chapter 4 is a method question before it is a cfm question. An operable window is not Table 403.
Educational. Healthcare / I-2 follows ASHRAE 170 / IMC 407. Garages follow IMC 404, not Table 403.
What to send, by job type
Cuando la herramienta no basta
Si el resultado depende de sus planos, envíelos. El estimador termina donde empieza el encargo.
Enviar antecedentes+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com
Masterbuild presta servicios de ingeniería bajo un alcance escrito. Nada en esta página es un dictamen de código para su proyecto.