/ Field knowledge · IMC 308

“Per code” is not a clearance reduction.

IMC 308: start with the listed clearance. If the listing prohibits reduction, the discussion is over. A note that says “clearance reduction per code” is not an assembly.

Educational 2024 IMC 308. Confirm adopted edition, listing, and manufacturer instructions. This is not a reduced-clearance design.

Detail, not a note

Show original required clearance, proposed reduced clearance, material, airspace, support, UL 1618 or table basis, and the combustible being protected. Walk the installed clearance before startup — field substitutions kill the reduction.

Source: DCT 308 · chimneys: 805 · kitchen: 506–508 · tool: clearance check.

What to send

The listing clearance, a photo or section of the tight side, and whether anyone already “reduced it in the field.”

If the unit is closer than the listing

Send the listing and the tight dimension. Masterbuild will say whether 308 is even on the path — or the listing already closed it.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is project-specific engineering advice, a code interpretation for your project, or a representation about permit approval.