Fire Rescue is a second desk.
Fire Rescue is a second desk. The building mechanical permit does not pay that bill. Original Masterbuild writing — not a copy of Implementing Order 04-123 and not a fee quote. Fire dollars change. Open the live Order the day you apply. County-published: no Fire application, permit, certificate, or receipt until the Fire fee is paid.
Packet: Fire second-desk PDF · ES. Building categories: MEP fee navigator. Kitchen: Type I / Type II.
- Work started without a Fire permit is a double-fee path.
- Up-front processing is a percentage of the Fire permit (County-published as approximately 30 percent — confirm live), not refundable, credited to the final Fire fee.
- Hood, fire alarm, suppression, smoke control, generator load-bank, in-building radio enhancement are not “included in mechanical.” Count devices the way the Order counts them.
- Inspection day: plans and card on site, access, someone there, address correct, previous violations actually corrected. Same-day cancellation is a re-inspection path. Smoke-control and generator load-bank are often a special-request inspection on top of the test.
Mechanical approved, Fire never paid the up-front, alarm device count wrong, nobody on site at CO
Building clock still running.
What to send
Occupancy, whether there is a hood / alarm / suppression / smoke control / generator, and whether Fire already has a process number.
If mechanical is approved and Fire has never seen the hood
Send the occupancy and the hood/alarm story. Masterbuild will say whether Fire still has no row — not quote a Fire fee.