/ Miami-Dade · Foundation grounding

The electrode is visible before the concrete.

The electrode is visible before the concrete. After the pour it is a story. Original Masterbuild writing — not a copy of the County electrical-inspection.pdf. Foundation grounding and underground are inspection types of their own. We do not invent burial depths or Article 110 working-space numbers. Photograph it. Then pour.

Packet: foundation grounding PDF · ES. Inspection-day: electrical inspection-day. Work-with: FPL drop-and-pick-up. Bond: gas bond.

Tool: Electrode, TCO, or gas bond?

Slab poured, electrode never inspected, metallic water already plastic

You cannot un-pour a slab for a grounding comment.

What to send

Inspection type, a photo of the electrode as it will be when the inspector arrives, and whether metallic water service is still in the picture.

If the pour is tomorrow and the electrode has never been seen

Send the photo. Masterbuild will say whether grounding still has no row — not whether the inspector will pass.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is an electrical inspection, a grounding design, or a representation about passing. Confirm the live County electrical inspection guideline. This is not legal advice.