Gas piping still has to be bonded.

Gas piping still has to be bonded. “Electrical will catch it” is not a bond. Original Masterbuild writing — not a copy of the County plumbing-inspection.pdf. County plumbing and gas finals look for bonding of gas piping when there is no electrical permit covering that bond. We do not invent a bonding-jumper size.

Packet: gas bond PDF · ES. Plumbing inspection-day: dry pan is a story. Electrode: before the pour.

Gas final called, bond missing, metallic water already plastic, electrical never permitted

Two trades, one missed jumper. Re-inspection.

What to send

Whether there is an electrical permit on this job, a photo of the gas piping bond (or the lack of one), and whether metallic water service was replaced.

If the gas final is tomorrow and electrical was never pulled

Send the photo. Masterbuild will say whether the bond still has no row — not whether the inspector will pass.