/ Miami-Dade · Plumbing inspection

You inspect first. A filled shower pan is a test.

You inspect first. A filled shower pan is a test. A dry pan is a story. Original Masterbuild writing — not a copy of the County plumbing-inspection.pdf. Water and Sewer is a different desk. We do not take that work on as a Masterbuild service. Confirm the adopted plumbing book the day you call.

Packet: plumbing inspection-day PDF · ES. Pre-upload: plumbing review. Code Relief still wants T&P: Code Relief.

Tool: which inspection are you actually calling?

Dry pan, meter not set, gas unbonded, interceptor still missing from the isometric

Re-inspection. The inspector is not required to only chase the items you listed.

What to send

Inspection type (ground rough, rough, water test, gas, final), fixture count vs plans, whether the meter is set, comments if you already failed.

If plumbing final is tomorrow and the meter is not set

Send the inspection type. Masterbuild will say whether plumbing still has no meter row — not whether the inspector will pass.