Code Relief is not amnesty.

Code Relief is not amnesty. Construction must have commenced prior to March 1, 2002. The current owner is responsible. You still get a current-code life-safety overlay and an as-built certificate that names its method. Original Masterbuild writing — not a County form. Confirm the live County Code Relief page and Ordinance 02-44.

Packet: Code Relief PDF · ES. We do not seal structural soundness of unpermitted work. MEP as-built readiness is a written scope after the responsible professional confirms authority for THAT building.

Fire and Water and Sewer may still review. Masterbuild does not take on Water and Sewer as a service. Fire is a second desk: MEP fee navigator.

1998 addition, no aerial, “grandfather the electrical”

Hard-wired smokes, GFI, T&P, and gas bonding are still current-code. Structural still needs its own professional.

What to send

Folio, what was built, any evidence of the year, whether a permit number exists, and which trades are open.

If the addition has been there since before 2002 and nobody can find the plans

Send the folio and what you know. Masterbuild will say whether MEP as-built readiness is even on the path — not whether the building qualifies for Code Relief.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is an as-built certificate, a determination of eligibility, a structural inspection, or a representation about permit approval. Confirm the live County Code Relief page. This is not legal advice.