/ Miami-Dade · Electrical inspection
Working space is shown. A cardboard box in the electric room is a fail.
Working space is shown. Directories are filled. Unused openings are closed. A cardboard box in the electric room is a fail. Original Masterbuild writing — not a copy of the County electrical-inspection.pdf. We do not publish Article 110 working-space dimensions here. Show the space. Photograph it. Keep it empty.
Packet: electrical inspection-day PDF · ES. Pre-upload: electrical review. Work-with: FPL drop-and-pick-up.
- Permit card matches the route. Previous comments get read. Do not call final while a partial is open.
- Listed equipment. Interrupting ratings. Unused openings closed. Equipment short-circuit current rating (SCCR) and available fault current need numbers.
- Working space is dedicated space, not storage. Entrance, exit, illumination — shown, not hoped. We do not invent a clearance number.
- Disconnects identified. Panel directories filled. A marker that says “AC” on six breakers is not a directory.
- Underground and slab happen before the pour. Work-with is a different door from a new service. Foundation grounding: electrode visible, then pour.
Fault current never named, electric room used for paint, directory blank
The inspector is looking at the approved plans, not at your memory of the last job.
What to send
Inspection type, one-line, and a photo of the electric room as it will be when the inspector arrives.
If the electric room is still a closet and the inspection is on the calendar
Send a photo of the door. Masterbuild will say whether working space still has no row — not whether the inspector will pass.