Check the property line and highway right-of-way before placing the pad.

For unincorporated Miami-Dade, Section 33-42 calls for a certified survey when the work is within 10 feet of a property line, within 25 feet of an existing or proposed highway right-of-way, or when the official doubts the line. The survey locates the work; the applicable district, yard and other approvals still decide whether the pad can stay there. MasterBuild does not certify property lines.

Packet: equipment setback PDF · ES. Openings: conditional wall-opening setbacks. Height: roof-height exceptions. County Section 33-42.

Tool: Pad, wall opening or roof height?

Condenser three feet off the fence, no survey, intake in the same side wall

Zoning on Monday. Mechanical on Tuesday. Two desks. One pad.

What to send

Site plan or survey, proposed pad location, distances to property lines and existing or proposed highway right-of-way, district and adjacent use, and whether this is zero-lot-line.

If the pad is already against the fence and nobody ordered a survey

Send the location. MasterBuild will say whether the pad still has no row — not whether Zoning will accept the setback.