/ Miami-Dade · Building moratorium

A new condenser is not a fence.

A building moratorium stops building permits. Mechanical is a building permit. A repair might be an exception. A new condenser is not a fence. Original Masterbuild writing — not a copy of 33-319 through 33-323 and not a map of every study area. Confirm the live administrative order for that folio the day you bid the change-out.

Packet: moratorium PDF · ES. Change-out: serials on the form. Variance clock: three years still run. 180-day: a fail does not extend.

Change-out already on the truck, folio inside a study-area moratorium, contractor called it a repair

Inspector called it a new unit. No exemption on file. Two wasted days.

What to send

Folio, whether you have seen a moratorium order, and whether this is a repair, a change-out, or new equipment.

If the unit is on the truck and nobody checked the order

Send the folio. Masterbuild will say whether a mechanical permit still has no row — not whether an exemption will issue.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is a moratorium exemption, a map of study areas, or a representation that a permit will issue. Confirm the live administrative order. This is not legal advice.