/ Miami-Dade · Variance clock

A variance is not a mechanical permit.

A variance for the generator pad is not a mechanical permit. If you do not use it, the Board can take it back. Original Masterbuild writing — not a copy of Chapter 33 Article XXXVI and not zoning advice. Masterbuild seals MEP. We do not file Community Zoning Appeals Board applications. We do not argue vested rights. Confirm live 33-317.

Packet: variance clock PDF · ES. 180-day building-permit clock: a fail does not extend. Pad location: ten-foot survey. DIC: not mechanical review.

Tool: Variance clock, DIC, or a moratorium?

Setback variance from 2022, condenser still on the truck, rezoning filed in 2026

Permits frozen. Variance may terminate. Two zoning clocks, zero MEP.

What to send

The resolution number, the date it was granted, whether a building permit was issued and acted upon, and whether a rezoning or Commission review is pending.

If the variance is older than you think and the pad is still in the catalog

Send the resolution. Masterbuild will say whether the mechanical set still has no row — not whether the Board will keep the variance.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is a variance application, a vested-rights determination, a bond, or a representation about the Board. Confirm live 33-317. This is not legal advice.