/ Field knowledge · Kitchen + plumbing

The hood and the interceptor are one job.

A Type I hood on the mechanical sheets and no grease interceptor on the plumbing sheets is two comments, not a sequencing issue. The menu drives both.

What has to match

The usual failed VE

Keeping the Type I hood and cutting the interceptor to “fit the room.” That fails plumbing review, then fails the first grease inspection. See plumbing VE.

Tools: Type I / Type II · plumbing VE flags · hood vs interceptor check.

What to send

Architectural kitchen plan, equipment schedule, existing hood/termination photos on a remodel, plumbing plan or fixture list, and whether sewer is public.

If the hood and the interceptor are not on the same set

Send the menu/equipment schedule and both drawing sets — or the share link.

Send Project Background

+1 (786) 398-6940  ·  osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is project-specific engineering advice, a code interpretation for your project, or a representation about permit approval.