/ Miami-Dade · Impact fees

Impact fees are not the mechanical permit sheet.

The mechanical fee sheet does not pay mobility, fire, police, school, or parks. Those are impact fees — a different desk, a different unit, and often a different land-use row than the occupancy on the M-sheets. This page does not compute your fee. Confirm the live County schedule the day you apply. Unincorporated Miami-Dade. Municipalities have their own schedules — call the city.

Live County page: Impact Fees (786-315-2670). Mechanical / electrical / plumbing permit categories are a different document — MEP fee navigator. Packet: impact-fee coordinator (PDF) · ES. Tool: Which bucket and which unit?

The pro forma used “office.” The menu is a restaurant.

Or warehouse was priced as fulfillment. Or hotel was priced as all-suites. Or school was omitted on a residential count. Or the mechanical permit fee was treated as the whole County cost. Send the folio and the actual use — not the row you wish you were in.

Dated snapshot — how to read the County table (not a quote)

Educational snapshot of the County impact-fee schedule the owner provided 17 September 2026. Not a Masterbuild fee. Not a quote. Confirm the live County PDF the day you apply. Mobility figures below are the four context-zone columns in order 1 / 2 / 3 / 4.

Permit-processing fees (ton, outlet, fixture, sq ft of conditioned space) live on the mechanical / electrical / plumbing sheets — MEP fee-sheet baseline (PDF). Those dollars are not impact fees.

What to send

The land-use row you think you are in, gross square feet or dwelling-unit count, folio (does it start with 30?), occupancy / menu, new construction vs change of use, and whether a Housing Agreement exists.

If the pro forma used the wrong land-use row

Send the folio and the actual use. Masterbuild will say whether the row even matches the MEP occupancy — not quote a fee.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is a fee quote, a County instruction, an exemption filing, or a representation about permit approval. Snapshot figures are educational copies of the County schedule the owner provided 17 September 2026 — confirm the live PDF. This is not legal advice.