If it is not to scale, it is not a construction document.

IMC 106: if the set is not to scale, the penetrations are unlabeled, and the approved field set is not on site, the documents are not construction documents.

Educational 2024 IMC 106. Confirm adopted edition, state sealing law, and AHJ format. This is not a completeness stamp. Do not assume a universal 180-day retention period. Packet: 106 PDF · ES.

No scale, no penetration, no field set

Those three are the most common 106 comments. Deferred items without a named responsible party are next.

Source: DCT 106 · Chapter 1: permit risk · pre-submittal: checklist · structure: 302.

What to send

The current set or share link, whether the building is over two stories, and the comment letter if review already started.

If the comment is “drawings not to scale”

Send the letter and the set. MasterBuild will say whether 106 is even the issue — or the penetration matrix for a building over two stories was never drawn.