Chapter 1 controls permit risk on every mechanical job.
Technical chapters get the attention. Chapter 1 decides whether the set is even in the right code, the right occupancy, and the right permit path. That is where a lot of Miami mechanical comments actually start.
Daily Code Talk already walks IMC 101–102. This page is the field version: what Chapter 1 does to a live permit set before anyone argues Table 403.
What Chapter 1 is doing on your sheets
- Which code. Florida adopts an FBC Mechanical edition. Teaching 2024 IMC is preparation. The reviewer is on the adopted FBC. See FBC vs IMC.
- Applicability. IMC 102: existing buildings, additions, referenced standards, conflicts. A “new typical” on an existing shaft is a 102 problem, not a 403 problem.
- Who is responsible. The permit, the inspections, and the PE of record. A note that “contractor to verify” does not move a Chapter 1 duty onto the GC.
- Alternate methods. If you need one, it has to be asked for — not hidden in a typical.
- IMC 105 mechanical permits · IMC 106 construction documents.
Skipping to Chapter 4
Outdoor-air math on a job that is actually existing-building, a change of occupancy, or the wrong edition will come back. Method first, cfm second.
Related: IMC 102 post · DCT kickoff (Ch. 1) · IMC hub · comment response.
What to send
The comment letter or the question, the current set, occupancy, and whether this is new, TI, or existing. Permit number if review already started.
If the comment is really a path question
Send the letter and the set. Masterbuild will say whether this is edition, applicability, or a technical chapter.