Chapter 1 controls permit risk on every mechanical job.

Technical chapters get the attention. Chapter 1 decides whether the set is even in the right code, the right occupancy, and the right permit path. That is where a lot of Miami mechanical comments actually start.

Daily Code Talk already walks IMC 101–102. This page is the field version: what Chapter 1 does to a live permit set before anyone argues Table 403.

What Chapter 1 is doing on your sheets

Skipping to Chapter 4

Outdoor-air math on a job that is actually existing-building, a change of occupancy, or the wrong edition will come back. Method first, cfm second.

Related: IMC 102 post · DCT kickoff (Ch. 1) · IMC hub · comment response.

What to send

The comment letter or the question, the current set, occupancy, and whether this is new, TI, or existing. Permit number if review already started.

If the comment is really a path question

Send the letter and the set. Masterbuild will say whether this is edition, applicability, or a technical chapter.

Send Project Background