Exemption is not permission to skip the code.

IMC 105: exemption is not permission to violate the code. Starting before the permit is issued is a 108 problem. A set that covers more or less than the permit is a stop-work problem.

Educational 2024 IMC 105. Confirm adopted edition and AHJ procedure. This is not a permit application. Model-code text may use 180-day periods — local adoption can change, delete, or replace them. Do not assume a universal duration, one-extension limit, or fee.

Scope mismatch

The field adds mechanical work that was not on the approved set, or drops scope without an amendment. Track application-abandonment and issued-permit deadlines separately — they may run concurrently.

Source: DCT 105 · Chapter 1: permit risk · documents: 106 · stop-work: 115 · Miami-Dade: HB 803 / mechanical still needs a permit.

What to send

What work is proposed, whether anyone already started, and the jurisdiction.

If the GC wants to start before the stamp

Send the scope. Masterbuild will say whether 105 even has a path — or this is already a 108 / stop-work conversation.