/ Miami-Dade · Duct leakage

Duct leakage is not a blower-door test.

Duct leakage is not a blower-door test. A sticker on the air handler is not either. Original Masterbuild writing — not a copy of the County mechanical-inspection guideline. County mechanical final looks for duct-leakage testing under the adopted energy code: rough-in or post-construction, with published exceptions. Confirm the adopted edition. We do not publish a leakage class or a pass number here.

Packet: duct leakage PDF · ES. Envelope: ACH50 / blower door. Return path: return air.

Tool: ACH50, duct leakage, or Notice of Commencement?

Blower-door passed, ducts never tested, flex added after rough-in

The envelope number did not buy the duct test.

What to send

Energy path, rough-in or post-construction, and whether flexible duct changed after the test.

If the envelope passed and the ducts were never tested

Send the energy path. Masterbuild will say whether the duct row still has no protocol — not whether it will pass.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is a duct-leakage test, an energy form, or a representation about passing. Confirm the live County mechanical inspection guideline and the adopted energy edition. This is not legal advice.