/ Miami-Dade · Portal doors

A revision, a rework, and a shop drawing are three portal choices.

A revision, a rework, and a shop drawing are three portal choices. Mixing them is how you pay for a review that never started. Original Masterbuild writing — not a copy of the County how-to-apply page. Plans are not reviewed until required upfront fees are paid. We do not quote those dollars.

Packet: revision vs rework PDF · ES. Apply: how to apply. Comments: typical comments. Approved as Noted: field packets.

Shop drawing uploaded as a rework, upfront not paid, GC thinks it is in review

It is not. The portal disposition is the record.

What to send

Process or UP number, the last comments PDF, and whether the approved set is changing or you are only answering comments.

If you uploaded the wrong door and the disposition has not moved

Send the comments PDF. Masterbuild will say whether the portal still has no row — not whether the reviewer will agree.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is a portal filing, a fee quote, or a representation about review. Confirm the live County how-to-apply page. This is not legal advice.