/ Miami-Dade · Electrical recertification prep

The County electrical guideline is a photo log.

The County electrical guideline is 28 inspection rows plus thermography, and most rows want a photograph. A panel directory from 1987 is not the report. This page is the PE translation — not a fillable copy of electrical-recertification.pdf. We do not publish Article 110 working-space dimensions here. Show the space. Photograph it.

Official County form (theirs): electrical-recertification.pdf. Masterbuild packet: field-prep PDF. Owner clock: 40-year notice. Readiness: electrical recertification readiness.

Drafted from a 1998 schedule, no photos, fire-alarm panel in trouble, structural already sealed

Electrical cannot be backdated to match someone else’s calendar.

What to send

The notice, access reality (which rooms you can open), and any prior electrical recertification. Do not reconstruct a riser from memory.

If nobody has scheduled thermography and the electric room is a storage closet

Send the notice and a photo of the door. Masterbuild will say whether readiness still has no access plan — or the thermography row is still empty.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is a recertification, a pass/fail, or a representation about County acceptance. Sealing only after the responsible electrical professional confirms authority for that building. We do not seal the structural report or 8C-6 guardrails. Confirm the live County guideline. This is not legal advice.