/ Field knowledge · IMC 602

If it is a plenum, say so — and list what is in it.

IMC 602: a space used as a plenum that is not documented as one is the comment. Materials above the ceiling have to be listed for plenum use. Closing the ceiling before inspection is demolition later.

Educational 2024 IMC 602. Confirm adopted edition, fire areas, and flood elevation. This is not a plenum listing or a materials approval. Packet: 602 PDF · ES.

TI junk above the ceiling

A plenum that was compliant at original construction and then accumulated non-rated cable during tenant improvements needs an audit before new above-ceiling work. List each plenum, function, and listing basis on M-001.

Source: DCT 602 · construction: 602.2 · materials/flood: 602.3–602.4 · ducts: Chapter 6 · dampers: 607.

What to send

Whether the ceiling is a return plenum, the fire-area map, and a photo of what’s already above the ceiling on a TI.

If the ceiling is the return

Send the RCP and whether this is a TI. MasterBuild will say whether 602 even applies — or the ceiling is already full of non-plenum cable.