/ Miami-Dade · Mechanical review

The County guideline is a list of titles. The comment is specific.

The County’s commercial mechanical guideline is a list of code titles the Building Official verifies before the stamp. It is not a set of drawings. Masterbuild’s version is the order a PE uses before the upload — occupancy and process first, then outdoor air, then the exhaust that is not a toilet fan, then ducts and vents. We do not host the County PDF. Open theirs. Use ours to see which Masterbuild hub actually answers the comment.

Educational. Official County papers (current edition is theirs, not ours): commercial mechanical guideline · residential · inspection checklist. Those documents cite the Florida Building Code as adopted. Confirm the live files. This page is not a copy of the County form and not a plan-review.

Order of operations before you upload

“Approved as Noted” is not “ignore the notes”

The County publishes Approved as Noted criteria for building, structural, electrical, mechanical, and plumbing. The notes on the stamp still bind. AAN is not a silent approval of the original miss. Answer the notes on the resubmittal or they travel to inspection.

Concurrent Plans Processing (CPP) lets more than one discipline run. Mechanical still has to close. Inspection is not a second plan review — stamped Job Copy on site, scheduled one business day prior. That procedure lives on how to apply.

Uploaded the architectural set and hoped mechanical would “follow”

The County guideline is a list of titles. The comment letter is specific. A missing outdoor-air note, an undrawn grease duct, or a garage unit with no mounting height is still the comment — even if CPP is checked.

Portals: which door · packets: pre-upload / inspection / AAN · resources: Masterbuild checklists · tool: Review-order screen · typical wording: plan-review comments.

What to send

The comments PDF (or the MeetQ screen), the process number, and whether this is commercial or one- and two-family. Do not send the entire County guideline — send the letter.

If the letter is a stack of “see mechanical guideline”

Send the PDF. Masterbuild will say which row is actually open — outdoor air, grease, a special-process exhaust, or a garage mount — and what drawing closes it.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is a County instruction, a copy of a County form, a code interpretation for your project, or a representation about permit approval. Confirm the live Miami-Dade PDFs and the adopted Florida Building Code. “Approved as Noted” notes still bind. This is not legal advice.