No permit is valid until the fees are paid.

IMC 108: no permit (or amendment) is valid until the fees are paid. Use the AHJ’s published schedule — don’t guess. Starting before the permit is a penalty on top of the permit fee. Impact fees are typically not routine on mechanical permits — confirm.

Educational 2024 IMC 108. Confirm the AHJ’s published schedule. This is not a fee quote and not a valuation for your job.

Attach a 1-page valuation sheet: major equipment, duct/pipe takeoffs, controls, labor, vendor quotes, declared total, other jurisdictional fees. If costs rise later, amend early. Do not mobilize until the permit is issued.

Valuation that doesn’t match the scope

AHJs track declared value against similar projects. A challenged valuation delays issuance. Value-engineered substitutions after issuance may need a revised valuation and amendment before the substituted work starts.

Source: DCT 108 · permits: 105 · documents: 106 · approval: 107.

What to send

The declared valuation and whether any work started before issuance.

If the AHJ challenged the valuation

Send the 1-page sheet. Masterbuild will say whether 108.3 even has a total — or the early start already added a penalty.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is project-specific engineering advice, a code interpretation for your project, or a representation about permit approval. Confirm the adopted edition. Ez and Voz values below are 2024 IMC 403.3.1.1 education from Daily Code Talk — not a sealed outdoor-air design. This page is not a fee quote.