/ Field knowledge · IMC 107

Passing underground does not approve rough-in.

IMC 107: passing underground does not approve rough-in. A notice of approval is a mechanical-system approval, not the certificate of occupancy. An approval issued months ago does not protect work that was later altered.

Educational 2024 IMC 107. Confirm adopted edition and AHJ procedure. Distinct from 111 inspections. This is not a CO.

Before requesting approval: build to the stamped set, assemble signed test reports, confirm O&M matches what is installed. After approval, freeze field changes — any deviation goes through RFI + revised submittal + permit revision. Keep the notice and the approved set on site.

Covered before the call

Ductwork in walls before rough-in, equipment behind ceilings before equipment inspection, piping in slabs before underground. The fix is opening and re-inspection. Do not request final with incomplete or unsigned test reports.

Source: DCT 107 · inspections: 111 · permits: 105 · stop-work: 115.

What to send

Which phase you think is approved, whether anything was covered, and whether the work was altered after the notice.

If they treated underground as final

Send the notices you have. Masterbuild will say whether 107 even has a phase left — or the approval was already overtaken by a field change.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is project-specific engineering advice, a code interpretation for your project, or a representation about permit approval. Confirm the adopted edition. Opening sizes below are 2024 IMC Table 401.5 education from Daily Code Talk — not a louver selection. This page is not legal advice.