/ Field knowledge · IMC 111

If you bury it first, you will open it later.

IMC 111: an approval never legalizes a violation. If you bury it before the inspector sees it, expect demo. Inspection failures are sequencing failures.

Educational 2024 IMC 111. Confirm adopted edition and the AHJ request method. This is not an inspection schedule. Do not assume a universal 24- or 48-hour notice, and do not assume a universal 48-hour heater exception.

Covered before the call

Three patterns: concealing before the inspector arrives; skipping rough-in and going underground to final; showing up for a witnessed test without the instruments or the prefab evaluation report on site.

Source: DCT 111 · stop-work: 115 · documents: 106 · dampers: 607.

What to send

Which stage failed or is about to be covered, the jurisdiction, and photos of what is still visible.

If the ceiling is about to close

Send the photos. Masterbuild will say whether 111 even has a hold on that sheet — or the work is already a concealment problem.

Send Project Background