/ From the PE
The PE on the drawings also writes in public.
Short notes go to LinkedIn. The long, citable versions live here — original pages, not copies of LinkedIn posts.
HVAC vs how the building is built
Loads and outdoor air have to follow envelope, existing vs new, and occupancy method — not tons per square foot.
IMC Chapter 1 permit risk
Edition, applicability, and existing-building path before anyone argues Table 403.
Plumbing VE that fails
Interceptor cuts, missing isometrics, existing stacks, sewer vs septic.
- Osmany Portal, PE on LinkedIn — Florida PE 95945, bilingual EN/ES, Miami.
- Masterbuild Consulting company page
- Daily Code Talk — drawing-based IMC / NEC library
A LinkedIn post is not a code opinion for your permit. Sealed work needs a written engagement.
If the post describes your job
Location, stage, and the actual question.
Send Project Background+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com
Masterbuild provides engineering services under a written scope. Nothing on this page is project-specific engineering advice, a code interpretation for your project, or a representation about permit approval.