/ From the PE

The PE on the drawings also writes in public.

Short notes go to LinkedIn. The long, citable versions live here — original pages, not copies of LinkedIn posts.

HVAC vs how the building is built

Loads and outdoor air have to follow envelope, existing vs new, and occupancy method — not tons per square foot.

IMC Chapter 1 permit risk

Edition, applicability, and existing-building path before anyone argues Table 403.

Plumbing VE that fails

Interceptor cuts, missing isometrics, existing stacks, sewer vs septic.

A LinkedIn post is not a code opinion for your permit. Sealed work needs a written engagement.

If the post describes your job

Location, stage, and the actual question.

Send Project Background

+1 (786) 398-6940  ·  osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is project-specific engineering advice, a code interpretation for your project, or a representation about permit approval.