HVAC design should change with how the building is constructed.

A load file copied from the last glass office onto a CBS warehouse, or from a new shell onto a 1970s TI, is how Miami jobs get oversize equipment, short latent capacity, and comments that look like “provide calculations.”

Osmany Portal, PE writes about this in public because it shows up on real sets: the mechanical design has to follow how the building is actually constructed — mass, envelope, existing vs new, conditioned vs warehouse, not a typical that assumes yesterday’s occupancy.

What actually changes the HVAC path

Copying tons-per-square-foot

Rules of thumb skip latent load, exhaust makeup, and the actual envelope. Reviewers in Miami-Dade will ask for the method. Send architecture and the existing HVAC, not a tonnage guess.

Run first: outdoor-air estimator · 401 vs 403 · load-calc hub · existing buildings.

What to send

Architectural plans and elevations, existing HVAC if any, occupancy list, and whether this is new, TI, or a change of use. A share link is enough.

If the last job’s load file is about to get reused

Send the architecture and the existing systems. Masterbuild will say whether the method even applies before anyone prices equipment.

Send Project Background