Load calculations fail when the envelope is fiction.
IMC 312 requires heating and cooling loads to be calculated. Florida humidity, glass, and ventilation makeup are where those calculations become comments — or change orders after the RTU is ordered.
What a defensible load file includes
- Envelope takeoff that matches the architectural drawings actually submitted
- Orientation, glass SHGC/U-factor, and shading that exist, not a generic Miami typical
- Occupancy and lighting that match the energy forms
- Outdoor-air and exhaust-makeup loads, not “infiltration covers it”
- Latent load in a climate where moisture, not just dry-bulb, sizes the coil
- Room-by-room or block loads consistent with how the system is actually zoned
- Method named: ASHRAE/ACCA Standard 183 or an approved equivalent using IECC Chapter 3 [CE] design parameters (educational IMC 312)
- Equipment schedule capacity traces to the load file — same story as ventilation schedule and controls
Schedule without a load file
Oversizing short-cycles and humidity; undersizing is owner risk. Escalate unusual envelopes, large OA, kitchens, labs, humidity-sensitive occupancies, and existing buildings with unknown envelope.
Free working tools: HVAC load-calculation checklist (EN) · ES · Florida envelope compliance reference
Related: IMC 312 Daily Code Talk · Ventilation hub · HVAC vs construction type
Send the architectural set
Plans, elevations, and any energy forms already started. Masterbuild will say whether the next step is a load file, a full permit set, or a review of someone else’s calculation.
Send Project Background+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com
Masterbuild provides engineering services under a written scope. Nothing on this page is project-specific engineering advice, a code interpretation for your project, or a representation about permit approval.