A change of occupancy is an MEP problem first.

A former office that is about to become a restaurant, clinic, or assembly room is not a furniture problem. Occupancy change rewrites outdoor air, exhaust, plumbing load, grease, fire, and often the electrical service.

Educational. Whether your job is a change of occupancy under the existing-building path is a determination against the adopted Florida code and the AHJ — not this page.

What usually has to be re-proven

Assuming the shell “already has HVAC”

The shell was permitted for a different use. Reviewers will ask for the method that matches the new occupancy. That is a first-week question, not a week-of-upload surprise.

What to send

Proposed use, existing use if known, architectural layout, photos of mechanical rooms / roof / panels, and whether review has started. A share link is enough.

If the use is changing and the HVAC is staying

Send the proposed occupancy and the existing conditions. Masterbuild will say whether this is a feasibility screen or a permit set.