/ Field knowledge · IMC 114

A field substitution is a violation the moment it leaves the set.

IMC 114: a field substitution without a permit revision is a violation the moment it diverges from the stamped set. Each day it continues is a separate offense. Do not ignore a Notice of Violation.

Educational 2024 IMC 114. Confirm adopted edition and local penalties. This is not legal advice and not a representation that Masterbuild can close an NOV.

The moment a NOV hits: stabilize (stop, LOTO if a hazard), photograph, build a corrections log, email an abatement plan, keep work visible for reinspection, do not reconnect utilities until authorized.

Field-fix and cover

An equipment swap, a reroute, or a penetration moved to a different assembly is a violation as soon as it leaves the approved set. A revision before install is days. An NOV after install is months. Do not request final with an open NOV — inspectors cross-reference them.

Source: DCT 114 · stop-work: 115 · utilities: 109.

What to send

The written notice, photos of the cited work, and whether anyone kept working or reconnected utilities.

If a Notice of Violation is on the job

Send the notice. Masterbuild will say whether 114 is a substitution, a concealment, or an unsafe-system issue — and what belongs in the abatement plan.

Send Project Background