The official can interpret. The official cannot waive.

IMC 104: the code official can interpret the IMC and cannot waive it. Listed does not mean approved for this application. Alternatives need written AHJ acceptance before the work — not after inspection fails.

Educational 2024 IMC 104. Confirm adopted edition. Distinct from 112 appeals and listed vs labeled. This is not legal advice.

Pre-submittal one-pager from Daily Code Talk: the IMC sections you are relying on, the listing proof (agency, standard and edition, report ID) and IOM pages, and a request for a short alignment call.

Alternate after the fail

104.2.3 submitted without AHJ pre-coordination is frequently rejected because the reviewer cannot approve it without escalation. Put the written pre-approval in the permit set. Do not reuse equipment without written confirmation of condition.

Source: DCT 104 · appeals: 112 · listed: listed vs labeled · applicability: 102.

What to send

Whether this is listed-as-used, an alternative, a modification, or reuse — plus the listing ID.

If the set relies on an alternate method

Send the one-pager. Masterbuild will say whether 104.2.3 even has a written path — or the listing was for a different use.

Send Project Background

+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com

Masterbuild provides engineering services under a written scope. Nothing on this page is project-specific engineering advice, a code interpretation for your project, or a representation about permit approval. Confirm the adopted edition. Recirculation numbers below are 2024 IMC 510.1.3 education from Daily Code Talk — not a dust-collector selection. This page is not an air-quality permit.