Daily Code Talk #161IMC 805.1-805.3 - Factory-Built Chimney Listing and Appliance Compatibility(1/5)

Match the chimney's actual classification and listed components to the appliance. Distinguish UL 103 Type HT, the open-combustion-chamber exception, and UL 127 factory-built fireplace systems before routing begins.

Permit Proof Chain

01Code TriggerIdentify why the section applies.
02Sheet EvidenceShow the requirement where the reviewer needs it.
03Coordination OwnerTie the requirement to the responsible discipline or party.
04Field ProofConfirm the installed condition can be verified.

Checking a chimney's diameter before checking its classification can send a coordinated project down the wrong path. A connection may fit physically while the appliance, fuel or fireplace requires a different listed system. Resolve identity and compatibility before investing in a route or accepting a substitution.

Listing Comes First

IMC 805.1 requires factory-built chimneys to be listed and labeled and installed and terminated under their manufacturer's instructions. Identify the actual product and its intended application. The broad listing requirement does not make every UL-listed metal chimney suitable for every appliance. Record manufacturer, model, listing classification, instruction revision and the compatible components specified for the installation.

Solid-Fuel Appliances in Dwelling Units

Section 805.2 uses the UL 103 Type HT path for factory-built chimneys installed in dwelling units with solid-fuel-burning appliances. Required identification includes Type HT and the Residential Type and Building Heating Appliance Chimney marking. A generic UL 103 reference alone does not establish the Type HT classification. The listed test classification is not a field instruction to operate a chimney at a test temperature.

Keep the Exception Within Its Scope

The stated exception concerns chimneys used with open-combustion-chamber fireplaces: UL 103 still applies, with the Residential Type and Building Heating Appliance Chimney marking, but the Type HT requirement described above is not imposed by that exception. For open-combustion-chamber appliances outside dwelling units, the section identifies the Building Heating Appliance Chimney or Residential Type and Building Heating Appliance Chimney marking. Do not extend an exception based only on a photograph or the word 'fireplace'; confirm the actual appliance classification.

Factory-Built Fireplaces Have Their Own Check

Section 805.3 requires chimneys used with factory-built fireplaces to comply with UL 127. Coordinate the fireplace and chimney as the compatible listed system identified by the manufacturer. Do not use the 805.2 exception to bypass this distinct requirement. The submittal should connect the fireplace model to the specified chimney and permitted termination and accessories.

Drawing, Submittal and Field Evidence

Tie the appliance schedule to the chimney schedule and section detail. Request the relevant listing/label information, full installation instructions and component list, including adapters, supports, firestops, insulation shields and termination. Before concealment, compare installed labels and joints with those records. Similar connection geometry does not authorize mixed components. A missing or unreadable label is an evidence gap requiring identification and evaluation, not proof of either compliance or failure.

Practical Review Sequence

Identify appliance and fuel; establish the applicable listing path; verify compatible chimney/components; then check routing, support, clearance and termination. This sequence can catch a wrong-system purchase before installed work must be removed. A field observation can establish visible identity and configuration, but it cannot verify concealed components or every listing condition without supporting records.

Project Boundary and Reference

This is 2024 IMC model-code education. Adopted edition, amendments, fuel-gas scope, manufacturer instructions and AHJ requirements must be confirmed for the project. 2024 IMC Chapter 8, International Code Council.

Continue Learning

Explore the Daily Code Talk archive for the next review: chimney offsets and structural support.

PE-led project support

Need this applied to a live project?

Masterbuild Consulting helps owners, architects, GCs, and project teams turn code questions into permit-ready MEP decisions before review comments, field changes, or inspection issues cost more time.

Daily Code Talk uses the 2024 IMC as model-code education. Verify the adopted code, local amendments, project scope, listings, manufacturer instructions, and AHJ path before project use.

Related Daily Code Talk posts