Sparky Edition #029Branch-Circuit LoadsNEC 120.10–120.16 · 2026 model-code education

A branch-circuit schedule needs the load served by each circuit. Motor, lighting, receptacle and appliance values are not interchangeable, and an empty breaker position says nothing about calculated capacity.

By Osmany Portal, PE

Permit Proof Chain

01Code TriggerIdentify why the section applies.
02Sheet EvidenceShow the requirement where the reviewer needs it.
03Coordination OwnerTie the requirement to the responsible party.
04Field ProofConfirm the installed condition can be verified.

Classify the load first

Sections 120.10–120.16 address branch-circuit loads and additions to existing installations. Use the actual equipment or outlet category and the applicable NEC article. Lighting equipment can draw more than its lamp wattage because drivers, ballasts or transformers are part of the electrical input. Motors and HVAC equipment also require their specific Articles 430 and 440 checks.

The dwelling 3 VA/ft² figure has a specific job

In the 2026 educational numbering, §120.13 uses 3 VA/ft² to determine the minimum number of dwelling branch circuits. That is a circuit-count basis. It is not the dwelling general-lighting and receptacle feeder/service value in §120.41; #030 explains that separate 2 VA/ft² calculation. Keep the two purposes on separate lines in the calculation.

Existing panels require two checks

When adding a new load under §120.16, verify both physical space for the proposed protective device and available calculated capacity. Obtain the panel schedule, identify the actual supplied loads, and check the service or feeder calculation before treating spare spaces as capacity.

Field check

  • Match each proposed outlet and fixed appliance to its circuit and rating.
  • Use the electrical input of selected lighting equipment, not lamp wattage alone.
  • Reconcile equipment schedules with panel schedules; verify existing loads before adding circuits.

Show on drawings

List circuit assignments and calculated loads on the circuit and panel schedules. Mark the existing versus proposed loads and show a feeder/service capacity check where the addition changes upstream demand. See branch circuit vs feeder for the OCPD boundary.

Code basis and applicability

Educational reference to the 2026 NEC Sections 120.10–120.16. Check the complete NFPA 70 text, the locally adopted edition and amendments, the authority having jurisdiction, and selected equipment instructions before project use. This page is not a project-specific load calculation or professional code determination.

PE-led project support

Need this applied to a live project?

MasterBuild Consulting helps owners, architects, GCs and project teams turn code questions into coordinated MEP decisions for review and construction.

Sparky Edition uses the 2026 NEC as model-code education. Project-specific engineering and AHJ response require a written MasterBuild engagement.

Related Daily Code Talk posts