/ PE-Led MEP · Miami
MEP Engineering in Miami
Masterbuild Consulting is a principal-led MEP engineering firm in Miami, Florida. We coordinate HVAC, plumbing, fire-protection, and electrical scopes for commercial, high-end residential, and mission-critical projects. Professional responsibility, discipline coverage, and signing and sealing are confirmed for each written engagement.
Florida PE 95945. Bilingual EN / ES. Standard permit scopes are generally proposed on a defined fixed-fee basis after scope review; recurring, additional, and unusual services follow the written agreement.
Service pages: MEP engineering in Miami · Electrical Building Recertification readiness · Miami-Dade septic feasibility screening · private-well record and permit readiness.
Services
- HVAC system design, load analysis, and ventilation coordination
- Plumbing design including domestic water, waste, vent, and gas
- Fire protection coordination and suppression review
- Electrical design for service, distribution, lighting, critical, and life-safety systems
- Existing commercial-building feasibility report support, including plumbing-system assessments
- Permit-set MEP packages and AHJ comment response
- Mission-critical scopes - healthcare (ASHRAE 170 / NFPA 99), labs, data centers
- Construction-phase advisory, RFIs, and field coordination
- Private-provider plan review and inspection are not currently offered.
- Monthly MEP Advisory under a defined written project retainer — separate from the Field Tools Membership
Daily Code Talk
Drawing-based explanations of MEP code logic, permit sensitivity, and field coordination - written by Masterbuild's PE and searchable by IMC chapter and section. Open Daily Code Talk → Join the free Code Desk email list →
Resources
See the full catalog on the dedicated Field Guides & Working Tools page →. Start free with the Daily Code Talk archive, the Code Desk email list, and the IMC 2024 Chapter 4 Ventilation Fundamentals Field Guide. Paid working guides: IMC Chapter 1 Permit Process Field Guide — $57, IMC Chapter 2 Definitions & Redline Prevention Field Guide — $57, IMC 2024 Chapter 3 Installation Readiness & Field Coordination Guide — $57, Permit Readiness Review Pack — $79, Owner-Side MEP Review Checklist Bundle — $99, Ventilation & Special Exhaust Field Guide — $149, IMC 2024 Chapter 6 Duct Systems Field Guide — $149, IMC 2024 Chapter 7 Combustion Air Field Guide — $149, IMC 2024 Chapter 5 Exhaust Systems Field Guide — $199, and IMC 2024 Chapters 6 + 7 Bundle — $249. Each chapter guide is a complete standalone package with a Read First file, the field guide, and its working tools. Chapter 5 is the deepest of the set: 31 pages across IMC Sections 501-513 plus a ten-sheet working file. Project-specific review begins with a written scope.
Field Tools Membership — prelaunch: MasterBuild is preparing a paid monthly library of maintained, PE-reviewed permit, field-observation, coordination, and closeout workflows. Preview the membership and request founding access — no charge today.
Contact
+1 (786) 398-6940 · osmany.portal@masterbuildconsulting.com
Miami, FL · Licensure confirmed per project scope and jurisdiction.
LinkedIn: linkedin.com/in/osmanyportal
Send Project Background →
JavaScript is required for the full interactive experience - including the bilingual EN/ES toggle, the resource library, and the contact form. The static text above is a courtesy fallback.